Case Study #3 Parts availability/UPS Bypass

Share this article:

Type of Facility: Casino



Product: Eaton 9390 - 80 kva



Summary: Parts availability / UPS bypass



Preliminary Actions: Customer had a fan fail alarm on there Eaton 9390-80 kva UPS.  FGC shipped replacement fans and scheduled technician to do a fan replacement.  When the technician got onsite and found failed fan he noticed that one of the wires from the AC capacitor assembly had been sucked up into fan blades causing damage to the fan and compromising the wiring on the capacitors Assembly. The UPS was put offline to ensure no further damage would be done to UPS.



Solutions: OEM could not provide replacement capacitor assembly in a timely manner as parts had a 3-4 week lead time.  FGC was able to fabricate a new wiring assembly from information out technician took while onsite and source replacement capacitors direct from the supplier to get parts shipped in 2 days and our technician was back onsite within 3 days to get the UPS back online and running properly.


Connect with Us:

More Industry-Leading Insights

A hallway filled with rows of servers in a data center.
29 May 2025
Data center UPS systems protect servers from power outages and surges, ensuring uptime, data security, and continuous business operations.
A group of surgeons are operating on a patient in an operating room.
28 May 2025
Regular UPS maintenance in hospitals ensures reliable power during outages, protecting critical medical equipment and patient safety.
Three different sizes of electrical drives are sitting on a wooden pallet.
27 May 2025
Follow this UPS maintenance guide for key best practices and a handy checklist to ensure reliable backup power and reduce unexpected failures.
More posts